Projects

RAP-project ExxonMobil, Europoort

Image

Project data


Sector:  Petro chemical industry 
Client: RijnDijk Steel Contracting BV 
Job: Basic engineering, Detailed engineering 
Size: approx. 350 k steel construction

Description


Engineering platform incl. Secondair facilities such as pipe supports, stairs, railings and cage ladders

Bosing has realized the largest and most complex load-bearing steel structures for the expansion of the capacity of the ESSO refinery. Next to solid load-bearing steel constructers, the starting point was to realize the safety items, as well as the pipe supports, in a 3D model. Our documents contain all customer-specific requirements and standards. This project was carried out in a short period of time.
Copyright © 2024 BOSING
BOSING BV
Klaverbaan 82, 2908 KD
Capelle a/d Ijssel
+31 (0) 10 22 39 603
info@bosing-bv.com