Project data
Sector: Retail Industry
Client: De Ammerse Smid BV
Job: Basic engineering, Detailed engineering
Size: Floor space approx. 4.200m2
Description
Clean lineation interior Speksnijder Mode
At the beginning of February 2008, the new Speksnijder Mode building in Bergambacht was completed. Under the new building, an underground parking basement had been realized for 37 cars, in which customers can easily park. A clothingstore for ladies, gentlemen and bridal fashion had been realized in the basement, as well as two apartments. The store consists of three layers.
Bosing was responsible for the elaboration of all steel and stainless steel structures. We have translated the constructions directly from architectural drawings into a simple, effective and beautiful total.